Tuesday, October 9, 2012

Progress report: Week 8

The front exterior underwent a major transformation last week, from this-


to this- 


Shingles? Windows? Enclosed entryway? This might turn into a house after all. And I can't forget the pride and joy of my husband, father-in-law, and contractor: the all-new-except-for-one-wall garage. Take a moment to absorb its beauty.


I know--that portal frame leaves me speechless too. 

Monday, October 1, 2012

Progress report: Week 7

Front exterior construction began, creating the attic dormer and the two new peaks at the entry-



and attic work continued-



A couple of delays have put things about a week behind the original schedule. Our contractor says he thinks they can catch up and still get us moved in close to on time. Stay tuned!

Wednesday, September 19, 2012

Progress report: Week 6

The attic/bonus space is being framed, and it's amazing how it changes the entire look and feel of the house. It's technically only a half-story, with about 450 square feet of livable space, but on a small house that makes a very big difference.



Friday, September 14, 2012

Progress report: Week 5

We have walls!

(back of house--master bedroom on left with opening for French doors)


(office)


And stairs!


And a second floor!


Don't worry--he had to hold hands with a grown-up every second he was up there. Except for when I took this picture, of course.

Friday, August 31, 2012

Progress report: Weeks 3 & 4

Week 3 - If destruction is progress, then we made great strides this week. The crew keeps finding more rotten wood, and the walls keep coming down.


Remember when we called this our kitchen? And our bathroom, and the laundry hallway? Now we call it outdoors.


Week 4 - Subfloor is going down and the addition we've only seen on paper is starting to become reality. This is our master bedroom and bath-


This will be the office and mudroom/laundry area. And check out our sweet garage in the background! When this is all over it might a) not be ready to fall over if leaned on and b) actually hold one small car.

Tuesday, August 14, 2012

Progress report: Week 3

This used to be the "master" bedroom--barely big enough to fit our queen bed and a desk. It's being expanded by several feet, making it about the same size as the other existing bedroom.



As you can see, contrary to my husband's assertions otherwise, staying in the house during the renovation wasn't really an option.

Wednesday, August 8, 2012

Progress report: Week 2

Hallway


Existing bathroom (will become kids/guest bath)


Kitchen


Backyard--prep work for foundation for the addition


Not much progress on these kids, but I'll keep working on them.